Rigged.
I finally got the mast on Coppelia up yesterday, and the sails raised, really pleased!
Still a way to go before first trip on the water:
- Sail repairs: cleats on foresails, rip in spinnaker.
- Mainsail outhaul (clew) needs strengthening.
- Halyards need fittings splicing to the line.
- Toestraps to be purchased and fitted.
- Deck fittings need sealing in place, keel bolt needs sealing.
- Rear lockers need lockable catches fitting.
- Sort out the forestay bottom fitting, it’s a mess at the moment.
The list is growing shorter every day
